Home
What's New
Products
Services
Applications
Courses & Shows
Museum
Literature
Privacy
About Us
Contact Us
Recruitment
Search
Links
Conversion Tables
Download
Site Map

Applications

Case Study

Menai Bridge: Load Monitoring

Following an inspection a decade ago, the Welsh Office was advised to reduce the allowable loading limit on the Menai Bridge in North Wales (built in 1826) from 32 to 7.5 tons. In an effort to help determine future load limits and the most effective means of strengthening the bridge, Laing Technology used a CR10 datalogger to record data from strain gauges, thermocouples, and load cells. Laing had to replace 25 of the hangers that link the deck to the suspension chain. Before removal, the load in each hanger was measured so that the replacement hanger was stressed to exactly the same load. Following these repairs, the CR10 helped show that the bridge was strong enough to operate at the 32 ton capacity. In fact, it is now cleared for 40 ton GVW.
Home | What's New | Products | Services | Applications | Courses & Shows | Museum | Literature | Privacy | About Us | Contact Us | Recruitment
Search | Links | Conversions | Download | Site Map

Questions? Please refer to the email address in this graphic if the adjacent link does not work.   Phone: (780) 454 2505
© 2008 Campbell Scientific, Inc., Campbell Scientific (Canada) Corp.