Home
What's New
Products
Services
Applications
Courses & Shows
Museum
Literature
Privacy
About Us
Contact Us
Recruitment
Search
Links
Conversion Tables
Download
Site Map

Applications

Case Study

London: Underground Excavation

More than 50 CR10-based monitoring systems were used for structural monitoring during the construction of London's Heathrow Express Rail Link. Similar systems are being used for the extension of the Underground's Jubilee Line. Reliable and accurate structural monitoring is especially critical since 12 km of the tunnel runs close to historical sites such as Big Ben, Westminster Bridge, and Canary Wharf. The systems monitor a range of sensors including electrolevels, borehole rod extensiometers, vibrating wire (VW) crackmeters, VW piezometers, and VW strain gauges.
Home | What's New | Products | Services | Applications | Courses & Shows | Museum | Literature | Privacy | About Us | Contact Us | Recruitment
Search | Links | Conversions | Download | Site Map

Questions? Please refer to the email address in this graphic if the adjacent link does not work.   Phone: (780) 454 2505
© 2008 Campbell Scientific, Inc., Campbell Scientific (Canada) Corp.